Deferred and Rejected Proposals
The following proposals have not been accepted, either deffered to a later time based on planning, or rejected based on concerns mentioned during the submission process.
- GSIP 12 - Mock Test Support — Provide base classes which make it trivial to develop unit tests based on a "mock" GeoServer setup.
- GSIP 17 - Community module handling
- GSIP 18 - Output Format Cleanup — A cleanup of the Output Format apis in GeoServer.
- GSIP 21 - KML Vector Transformer Refactoring — Clean up KMLVectorTransformer before it becomes more unmanageable than it already is.
- GSIP 24 - TIME-ELEVATION-BAND parameters parsing for WMS 1.1.1 WCS 1.X — The goal of this work is the introduction of initial capabilities to coherently parse TIME - ELEVATION - BAND parameters for WMS 1.1.1 and WCS 1.x modules.
- GSIP 36 - Resource - Publishing Split and Virtual Configuration — This proposal is deferred, as it is being done more incrementally, starting in gsips 66 and 67
- GSIP 37 - GPL plus Classpath Exception for Dispatch — Move the GeoServer dispatch system to GPL+Classpath Exception. (deferred - lost momentum)
- GSIP 3 - Issues List Module
- GSIP 40 - Review Process — Formalizing the GeoServer review processed.
- GSIP 43 - Roadmap and release handling process — A proposal for long and short term roadmap process and its relationship with releases and testing. Builds son top of the [GSIP 30 - Roadmap Process] experience and tries to improve over it.
- GSIP 45 - Moving GeoServer model in a standalone module — Moving the Geoserver catalog *Info beans into a standalone module.
- GSIP 4 - Status Interface
- GSIP 53 Geoserver security improvement — Make Geoserver ready for access control specific to geodata and evaluate Single Sign On technologies.
- GSIP 63 - Encrypt Plaintext Passwords — Support digest and encrypted passwords for users and datastore credentials.
- GSIP 9 - New Catalog — Replacing the existing GeoServer catalog with one which can provide more functionality and better scale.
These proposals may be resubmitted when their concerns have been addressed (ie timing for deferred proposals, or corrections for rejected proposals).
Added by Jody Garnett, last edited by Jody Garnett on Aug 02, 2006